Evolution of Quick-Build Bikeways
The first wave of quick-build materials like flexible posts, striping, and temporary barricades are versatile and allow for quick construction, but they aren’t as durable or inviting to a wide range of users as newer materials.
Why Material Selection Matters
Thoughtful choices help agencies:
- Bridge funding gaps by extending the life of quick-build projects until permanent reconstruction is feasible.
- Pilot complete street concepts at scale in safe, efficient, and compelling ways.
- Demonstrate results that help decision-makers build support for long-term, permanent investments.
- Build public trust in infrastructure investment choices with materials that are durable, low maintenance, and well-integrated into streets and communities.
- Improve people’s experience on the street with materials that feel protective, comfortable, and reliable for all, regardless of a person’s age or ability.
Introducing a Quick-Build Materials Toolbox for Bikeways
Our Quick-Build Materials Toolbox for Bikeways highlights materials that fit a range of budgets, timelines, and goals for durability, maintenance needs, and aesthetics. It is designed to help public agencies compare options and select the right fit for their project goals.
Toolbox in Action
We and our partners have several projects under design or construction throughout the US. See some of these materials from the Toolbox in current designs, and stay tuned for built pictures coming this year!
Protected Bikeway with Extruded Curb
Santa Monica, CA
Extruded Curb and Self-watering Planters
West Hollywood, CA
Fountain Avenue in West Hollywood pairs extruded curb with self-watering planters. The planters reinforce curb extensions, reduce vehicle encroachment, and add greenery to the corridor. Their built-in water reservoirs lower long-term maintenance needs (and costs) and create a streetscape that feels more welcoming.
Precast Curbs for Protected Bike Lanes
Dallas, TX
share this article
Contributors
Josh Peterman
Principal
PE, RSP1
Email Me
Kendra Rowley
Senior Associate
PE
Email Me
Natalie Chyba
Senior Associate
PE
Email Me
Danielle Caparas
Engineer/Planner
EIT
Email Me
Explore More
A Transformative Data Collection Solution: Responding with Our Research
We’ve completed an independent, third-party validation review of StreetLight Data’s intersection turning movement volume estimates. See what we found!
VMT Mitigation Through Fees, Banks, and Exchanges
On September 27, 2013, Governor Jerry Brown signed SB 743 into law and started a process intended to fundamentally change transportation impact analysis as part of CEQA compliance. These changes include elimination of auto delay, level of service (LOS), and other similar measures of vehicular capacity or traffic congestion as a basis for determining significant impacts. Instead, transportation impacts will be determined based on changes to vehicle miles of travel (VMT).
Jason Miller Joins the Fehr & Peers Team
We’re thrilled to welcome Jason Miller to the team. With a strong background in transit and a holistic approach to projects, we’re excited to bring his local focus and expertise to the Denver and Front Range communities we serve.










