Evolution of Quick-Build Bikeways
The first wave of quick-build materials like flexible posts, striping, and temporary barricades are versatile and allow for quick construction, but they aren’t as durable or inviting to a wide range of users as newer materials.
Why Material Selection Matters
Thoughtful choices help agencies:
- Bridge funding gaps by extending the life of quick-build projects until permanent reconstruction is feasible.
- Pilot complete street concepts at scale in safe, efficient, and compelling ways.
- Demonstrate results that help decision-makers build support for long-term, permanent investments.
- Build public trust in infrastructure investment choices with materials that are durable, low maintenance, and well-integrated into streets and communities.
- Improve people’s experience on the street with materials that feel protective, comfortable, and reliable for all, regardless of a person’s age or ability.
Introducing a Quick-Build Materials Toolbox for Bikeways
Our Quick-Build Materials Toolbox for Bikeways highlights materials that fit a range of budgets, timelines, and goals for durability, maintenance needs, and aesthetics. It is designed to help public agencies compare options and select the right fit for their project goals.
Toolbox in Action
We and our partners have several projects under design or construction throughout the US. See some of these materials from the Toolbox in current designs, and stay tuned for built pictures coming this year!
Protected Bikeway with Extruded Curb
Santa Monica, CA
Extruded Curb and Self-watering Planters
West Hollywood, CA
Fountain Avenue in West Hollywood pairs extruded curb with self-watering planters. The planters reinforce curb extensions, reduce vehicle encroachment, and add greenery to the corridor. Their built-in water reservoirs lower long-term maintenance needs (and costs) and create a streetscape that feels more welcoming.
Precast Curbs for Protected Bike Lanes
Dallas, TX
share this article
Contributors
Josh Peterman
Principal
PE, RSP1
Email Me
Kendra Rowley
Senior Associate
PE
Email Me
Natalie Chyba
Senior Associate
PE
Email Me
Danielle Caparas
Engineer/Planner
EIT
Email Me
Explore More
Achieving Freight Greenhouse Gas Goals
Available guidance for agencies to gather an accurate picture of current freight activity is limited. Check out how this community defined their baseline in four steps to be able to evaluate freight zero emission zones as a strategy for meeting new climate and environmental policy goals.
How Vehicle Electrification Affects the Gas Tax
With electric vehicle sales increasing, how durable is our ability to build and maintain highway and transit infrastructure through current gas tax measures? Explore the full scope of promoting a cleaner and more resilient transportation system.
2022 Staff Promotions
Congratulations to 151 team members on earning promotions this year, and to these 46 individuals who achieved step-level promotions effective July 1.










