Evolution of Quick-Build Bikeways
The first wave of quick-build materials like flexible posts, striping, and temporary barricades are versatile and allow for quick construction, but they aren’t as durable or inviting to a wide range of users as newer materials.
Why Material Selection Matters
Thoughtful choices help agencies:
- Bridge funding gaps by extending the life of quick-build projects until permanent reconstruction is feasible.
- Pilot complete street concepts at scale in safe, efficient, and compelling ways.
- Demonstrate results that help decision-makers build support for long-term, permanent investments.
- Build public trust in infrastructure investment choices with materials that are durable, low maintenance, and well-integrated into streets and communities.
- Improve people’s experience on the street with materials that feel protective, comfortable, and reliable for all, regardless of a person’s age or ability.
Introducing a Quick-Build Materials Toolbox for Bikeways
Our Quick-Build Materials Toolbox for Bikeways highlights materials that fit a range of budgets, timelines, and goals for durability, maintenance needs, and aesthetics. It is designed to help public agencies compare options and select the right fit for their project goals.
Toolbox in Action
We and our partners have several projects under design or construction throughout the US. See some of these materials from the Toolbox in current designs, and stay tuned for built pictures coming this year!
Protected Bikeway with Extruded Curb
Santa Monica, CA
Extruded Curb and Self-watering Planters
West Hollywood, CA
Fountain Avenue in West Hollywood pairs extruded curb with self-watering planters. The planters reinforce curb extensions, reduce vehicle encroachment, and add greenery to the corridor. Their built-in water reservoirs lower long-term maintenance needs (and costs) and create a streetscape that feels more welcoming.
Precast Curbs for Protected Bike Lanes
Dallas, TX
share this article
Contributors
Josh Peterman
Principal
PE, RSP1
Email Me
Kendra Rowley
Senior Associate
PE
Email Me
Natalie Chyba
Senior Associate
PE
Email Me
Danielle Caparas
Engineer/Planner
EIT
Email Me
Explore More
Infrastructure Projects & Greenhouse Gas Emissions
Can freeway infrastructure projects have a greenhouse gas emission benefit by improving travel speeds and reducing tailpipe emissions? Explore the corridor level results of three project case studies using different modeling approaches.
Disruptions in Transportation & Their Unequal Impacts
Increasing numbers of phenomena have disrupted our transportation system recently, and many of them have resulted in inequitable impacts on communities. We explored these dynamics in the realm of transportation equity.
Newly Promoted Firm Principals
Defined by our culture of empowerment and investment in the development of every employee, we are dedicated to career growth, even in uncertain economic times. While we are all navigating challenging circumstances, our firm recognizes that the achievements, dedication, and leadership of our valued team members never diminish. We’re pleased to congratulate our four newly promoted firm Principals.










